MAY/JUNE 2009
VOLUME 28, NUMBER 3
International Dredging Review
A crew member operates the controls to att ach the floating hose discharge line to the
dredge B.
E.
Lindholm for pumpout to Dewey Beach, Delaware.
Story on page 6.
WEDA chapter...
More
MAY/JUNE 2009
VOLUME 28, NUMBER 3
International Dredging Review
A crew member operates the controls to att ach the floating hose discharge line to the
dredge B.
E.
Lindholm for pumpout to Dewey Beach, Delaware.
Story on page 6.
WEDA chapter
meetings.
Page 18.
Dredging projects
in stimulus.
Page 9 and beyond.
Miami River project
ends, Fox River
project begins.
Page 36.
IN THIS ISSUE:
Less